Free tool · Australian dollars

Concrete Driveway Cost Calculator Australia

Build a budget for a new or replacement driveway. Measure the concrete, enter your quoted rates and see removal, finish, site work and GST as separate costs.

Do not have quoted rates yet? Use the quick installed-cost estimator for an initial area-and-finish budget, then return here to itemise your quotes.

1. Driveway scope
m
m
mm
%

100 mm and 10% are example inputs, not design or ordering recommendations. Use project drawings. Finish records the scope; it does not apply an automatic price multiplier. Update both supply and finishing rates to match your chosen finish.

2. Itemised quote inputs

Supply starts with one south-east Queensland supplier example, including GST, checked 4 November 2026. All other rates start at zero. Enter separate cost components only: an inclusive installed $/m² quote must not be added on top of supply and labour.

$/m³
$/m²
$/m²
$/m²
$/m
$
$
$
$
$
3. Crossover and budget reserve
%

Incomplete cost inputs · AUD

$1,919.94

Including GST · $32.00 per driveway m²

This is not an installed quote. Some work has no allowance. Zero means unbudgeted, included elsewhere or not needed — check each line.

Driveway area

60.00 m²

Geometric volume

6.000 m³

Volume with allowance

6.600 m³

Selected finish

Plain / broom
Concrete supply
$1,919.94
Base preparation
$0.00No allowance
Reinforcement and supports
$0.00No allowance
Placement and chosen finish
$0.00No allowance
Formwork
$0.00No allowance
Excavation and spoil disposal
$0.00No allowance
Access / extra handling
$0.00No allowance
Pump hire
$0.00No allowance
Delivery and supplier fees
$0.00No allowance
Other costs / drainage
$0.00No allowance
Budget reserve
$0.00
GST contained in total
$174.54

Before reserve: $1,919.94 including GST.

Quantities exclude beams, thickened edges and the separate crossover. Confirm joints, curing, sealing, drainage, minimum loads and supplier fees. Rate-based lines use the GST basis selected above.

Calculate driveway cost from quantities and scope

Area is length × width. Flat concrete volume is area × thickness ÷ 1,000 when thickness is in millimetres. The adjustable extra-volume allowance increases supply quantity only. This rectangular calculation excludes thickened edges, beams, steps and the separately budgeted crossover; divide irregular driveways into rectangles or get a measured take-off.

Base, reinforcement and placement use driveway area. Formwork uses the outside rectangle perimeter. Removal uses its own measured area. Excavation, access, pumping, delivery and drainage are whole-job allowances. Adding these components makes the estimate more useful than applying one installed rate to every site.

Driveway budget = supply + site preparation + reinforcement + formwork + placement and finish + replacement removal + access and fees + optional crossover + reserve + any GST to add.

Use the finish selector to describe your quote, then update the material and finishing rates. Changing the finish alone does not change the price. A quote covering supply and installation belongs in a separate comparison; do not enter its full $/m² rate as labour while also charging for concrete and steel.

All monetary inputs must use one GST basis. Changing the GST setting converts the existing rates to the other basis, rounded to cents. In exclusive mode the tool adds 10%; in inclusive mode it shows the GST already contained in the total. The optional reserve is for budgeting, not a contractor charge or a predicted low-to-high market range.

Worked example: replacing a 60 m² driveway

A 10 m × 6 m rectangle at an example 100 mm thickness contains 6 m³. A chosen 10% allowance gives 6.6 m³. At the starting supplier example of $290.90/m³ including GST, concrete supply is $1,919.94. This is the starting calculator result, with the remaining work unbudgeted.

For a replacement arithmetic example, enter a hypothetical removal quote of $30/m² over 60 m² ($1,800), plus $3,000 for other work. The subtotal becomes $6,719.94. A 10% reserve adds $671.99, producing $7,391.93 including GST, or $123.20 per driveway m². The $30 and $3,000 are invented inputs to demonstrate arithmetic, not market rates. A crossover and any unentered work remain excluded.

A thicker specified driveway changes concrete quantity, while demolition depends on the old pavement. Do not scale every cost by the new thickness. Confirm both old and new dimensions with the contractor. Our driveway thickness guidance explains why vehicle loads and project requirements come before choosing a quantity.

Australian pricing evidence and its limits

The editable $290.90/m³ starting rate is Cheap Concrete Supplies’ weekday 25/20/80 listing, including GST, viewed 4 November 2026. It is a supply example, not a driveway mix recommendation or national installed price. Its delivery information names Brisbane, Gold Coast, Ipswich and Sunshine Coast, with radius limits and possible extra charges. Replace it with your project’s specified mix and current local quote. Use the concrete supply and delivery price guide to compare those rates.

Adelaide contractor Dalmatian Concreters publishes a rate card in its June 2025 upload, viewed 4 November 2026. It treats prices as estimates requiring inspection, generally excludes GST and says pumping, tipping, formwork, mesh, sealing and saw cuts may be excluded unless quoted. Those conditions illustrate why a headline finish rate cannot safely be treated as a complete installation price. Its rates are not used in this calculator.

What to include in a driveway quote

  • New work: measured area, specified thickness, mix, reinforcement, base material, compaction, formwork and jointing.
  • Replacement: old pavement thickness, demolition access, loading, cartage, tipping and repairs to the exposed ground.
  • Finish: colour or aggregate selection, texture, curing, sealing and any sample approval.
  • Access: truck reach, pump setup, hose handling and extra labour. Use quoted dollar allowances instead of automatic slope percentages.
  • Drainage and crossover: falls, pits or channels, services, relevant council requirements, construction and fees.
  • Price terms: GST, minimum quantities, supplier fees, inclusions, exclusions and quote expiry.

Agree where shared costs sit. For example, a pump that places both driveway and crossover concrete should appear once. A removal quote including excavation should not be charged again as full excavation without checking the scope.

Read the concrete driveway cost guide for quote comparisons. Use the concrete volume calculator for quantities, the slab cost calculator for a general flat slab budget, or the general concrete cost calculator for a quick area-and-finish estimate.

After the quote, the pour still needs the right crew, pump and timing. ConConnect is being built to help Australian concreters, pump operators and subbies find work and organise jobs. Join the waitlist for launch updates.

FAQs

How do I calculate concrete driveway cost?

Multiply driveway length by width for area, then multiply by specified thickness in metres for volume. Price that quantity with a concrete supply quote, then add separately quoted preparation, steel, formwork, placement, finish, access and delivery. For replacement, add removal and disposal. This calculator totals your inputs; it does not issue an installed quote.

Does choosing exposed aggregate automatically increase the price?

No. The finish selector records your intended finish. Enter the appropriate supplier rate and placement-and-finishing rate from your quote. Decorative concrete may change material, finishing and sealing scope; there is no automatic national price multiplier in this tool.

How much does replacing an existing driveway cost?

Replacement adds demolition and disposal to the new driveway work. Select replacement and enter the old area and a removal rate that includes loading, transport and tipping. Ground repairs, excavation, drainage and restricted access may also need separate allowances. The old driveway area can differ from the new driveway area.

Is 100 mm the correct driveway thickness?

100 mm is an arithmetic example only. Use the thickness specified for your ground conditions, vehicle loads, design and local requirements. The calculator does not design a pavement or specify reinforcement, strength, joints or crossover construction.

Is the crossover included in the driveway area?

The optional crossover is a separate whole-job allowance. If you use it, exclude the crossover from the driveway dimensions and other cost lines. Ask the relevant council about approval, construction requirements, fees and inspections before finalising that allowance.

Why does the starting result say incomplete cost inputs?

Only concrete supply has a starting example price. Other costs are zero until you enter them. Zero is not a claim that work is free. Even when every line is filled in, the total remains a budget based on your inputs, subject to the contractor confirming scope and site conditions.

Get ready for your next pour

ConConnect is being built for Australian concreters, pump operators and subbies to find work and organise jobs. Join the waitlist for launch updates.